Assessment of Procurement Parameters for a Construction Material by using Taguchi Method (DOE) |
Author(s): |
| Harish Patel , CSIT, DURG (C.G.); Dr. Vivek Mishra, CSIT, DURG (C.G.) |
Keywords: |
| Procurement, ANOVA test, Materials, Parameters, Taguchi method |
Abstract |
|
In the present scenario all the industry wants to increase the productivity by reducing the unnecessary operation, barriers, losses and environmental pollution can help for winning the trust of customers and have began to pay more attention towards procurement. Implementation of procurement will result in significant improvement in all of these areas, material and help to achieve the goal of the industry. Procurement in the one most factor for saving cost by procure better product in right place for good quality product for right time in right place for continuous work of our organization or company. In procurement decision generally involved making buying decision under condition of scarcity. With the help of data analysis, it becomes easy to make use of economic analysis method such as cost-benefit analysis or cost utility analysis. The ANOVA test analysis for mixture machine, labour, steel and stone gives significant result of three procurement parameters i.e. Cost, Quality, Time are considered in which to draw plot graph and mathematical calculation and the result highly quality by help of Taguchi method in order to optimize the procurement process parameters for reducing the total cost of project. |
Other Details |
|
Paper ID: IJSRDV4I100534 Published in: Volume : 4, Issue : 10 Publication Date: 01/01/2017 Page(s): 802-806 |
Article Preview |
|
|
|
|