Cost Management of Commercial Buildings by Using Primavera Software: A Review |
Author(s): |
| Ms. Samrudhi Dipakraj Kashid , Tatyasaheb Kore Institute of Engineering & Technology, WARANANAGAR Kolhapur, India; Prof. S. S. Chavan, Tatyasaheb Kore Institute of Engineering & Technology, WARANANAGAR Kolhapur, India |
Keywords: |
| Cost Management, Primavera, G+9, Commercial, Time Period |
Abstract |
|
Project monitoring and control is that the process of collecting, recording, and reporting information concerning project performance. Project controlling uses the info from monitor activity to bring actual performance to planned performance. this study deals with the project monitoring process of “Standard Design Factoryâ€, a four storied (G+9) factory building whose construction is current at Dubai. A comparison between the planned progress of construction work and actual progress is performed during this study using project management software Primavera P6. Despite well-established principles and policies of project monitoring the method itself might not be efficiently accomplished in an exceedingly project, thanks to those practical problems existing or arising within the project Such an effort in realizing the sensible problems in implementation of project monitoring and control will contribute to proper recognition of the matter areas and fitting place the control process to rectify the deviations. |
Other Details |
|
Paper ID: IJSRDV10I40405 Published in: Volume : 10, Issue : 4 Publication Date: 01/07/2022 Page(s): 169-171 |
Article Preview |
|
|
|
|